当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:参照个人已完成的建筑、结构部分图纸,依据《建设工程工程量清单计价规范》(GB 50500-2008)进行列项,并计算工程量(可手工计算,也可以利用“鲁班”软件)。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
参照个人已完成的建筑、结构部分图纸,依据《建设工程工程量清单计价规范》(GB 50500-2008)进行列项,并计算工程量(可手工计算,也可以利用“鲁班”软件)。
问题补充:

  • 匿名
2013-05-23 12:21:38
Refer to the individual has completed the architectural drawings of structural parts, according to the Construction Works amount of inventory valuation norms (gb 50500-2008) for line-item, and calculate the engineering capacity (manual calculations, you can also use the software "Lu Ban").
  • 匿名
2013-05-23 12:23:18
In light of the individual has completed building, part of a structure based on the drawings, and construction engineering Inventory Pricing specification (GB 50,500 - 2008 ) for a list, and calculate the amount (can be manually calculated, you can also use the "Lu" software).
  • 匿名
2013-05-23 12:24:58
Refers to individual already the construction, the structure partial blueprints which completes, rests on "Construction project Resilience Detailed list To count Price Standard" (GB 50500-2008) to enter the ranks item, and calculates the resilience (to be possible to calculate manually, also may use
  • 匿名
2013-05-23 12:26:38
Reference individual has complete the section of architectural and structural drawings, based on the codes for engineering Bill pricing of building engineering (GB 50500-2008) column, and calculates the quantity (calculated by hand, or you can use the "Luban" software).
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭