|
关注:1
2013-05-23 12:21
求翻译:Starting with July 2010 the works for the opening of the first quarry (GA3) commenced, till 15.11.2011 the land clearing woks being accomplished for a forest area of l.0 hectares, as well as the stripping of the vegetable soil and opening of semitrenches, inclines and access roads at the base of the quarry and the uppe是什么意思?![]() ![]() Starting with July 2010 the works for the opening of the first quarry (GA3) commenced, till 15.11.2011 the land clearing woks being accomplished for a forest area of l.0 hectares, as well as the stripping of the vegetable soil and opening of semitrenches, inclines and access roads at the base of the quarry and the uppe
问题补充: |
|
2013-05-23 12:21:38
正在翻译,请等待...
|
|
2013-05-23 12:23:18
正在翻译,请等待...
|
|
2013-05-23 12:24:58
开始以7月2010日工作为(GA3的)开始的开头第一件猎物, 15.11.2011集材铁锅是成功的为森林面积的l.0公顷,以及剥离菜土壤和开始semitrenches、斜面和通路在猎物的基地和第一和第二个开发阶段的上部小平台。
|
|
2013-05-23 12:26:38
从 2010 年 7 月开始开放第一鱼涌 (GA3) 的作品开始,直到 15.11.2011 清理正在完成的森林面积 l.0 公顷,以及剥出菜地土壤和 semitrenches、 倾斜变形以及道路上的第一和第二次开发阶段的上部沙堤与石矿场基地在开放的作品赫赫有名的土地。
|
|
2013-05-23 12:28:18
开始于 2010 年 7 月为第一采石场的打开工作 ( GA3 ) 开始,直到 15.11.2011 弄清楚为 l.0 公顷的一个森林领域完成的锅的陆地,以及植物土壤的脱光衣服,在采石场和首次和第二开发的上面的护坡道的基地半堑壕,斜坡和访问权限路的打开上演。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区