当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:and R chart. Both charts begin with an examination of the portion of the chart concerned with the variability of the process. The standard deviation, s, must be calculated for each subgroup. The value for s is the basis for an estimate of the process standard deviation, from which a set of factors for the control li是什么意思?

待解决 悬赏分:1 - 离问题结束还有
and R chart. Both charts begin with an examination of the portion of the chart concerned with the variability of the process. The standard deviation, s, must be calculated for each subgroup. The value for s is the basis for an estimate of the process standard deviation, from which a set of factors for the control li
问题补充:

  • 匿名
2013-05-23 12:21:38
和R图。这两个图表开始审查过程中的变异有关图表部分。标准偏差,必须为每个分组计算。价值估计过程的标准差,从开发一套控制范围的因素是基础。
  • 匿名
2013-05-23 12:23:18
和r表。 两个图表首先审查有关的部分与图表的变化性过程。 标准偏差,s,必须计算每个分组。 该值为s的基础是标准偏差的估计这一过程,一系列因素的控制极限值的制定。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
和 R 图表。这两个图表与考试有关的图表部分的开头过程的变异性。标准偏差,s,必须为每个分组计算。S 的值是进程的标准偏差,从中制定一套控制限制因素是估计的基础。
  • 匿名
2013-05-23 12:28:18
和 R 图表。图表以图表的部分的一场考试开始与过程的可变性有关。标准差, s,必须为每个小组群被计算。对于 s 的价值是其对于控制的一套因素限制的过程标准差一个估计的基础被开发。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭