|
关注:1
2013-05-23 12:21
求翻译:Providing and lowering in position Temporary steel linersfor bored cast insitupilesandremoved after PileConcrete as per direction of the Engineer and Technical Specification 700 .是什么意思?![]() ![]() Providing and lowering in position Temporary steel linersfor bored cast insitupilesandremoved after PileConcrete as per direction of the Engineer and Technical Specification 700 .
问题补充: |
|
2013-05-23 12:21:38
[object Object]
|
|
2013-05-23 12:23:18
And in lowering Providing Temporary position after PileConcrete insitupilesandremoved cast steel linersfor bored as per the direction of Engineer Technical Specification and 700 .
|
|
2013-05-23 12:24:58
Providing and lowering in position Temporary steel linersfor bored cast insitupilesandremoved after PileConcrete as per direction of the Engineer and Technical Specification 700.
|
|
2013-05-23 12:26:38
Providing and lowering in position Temporary steel linersfor bored cast insitupilesandremoved after PileConcrete as per direction of the Engineer and Technical Specification 700 .
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区