求翻译:本施工计划按暖通图纸的要求进行施工,如图纸有变动,施工周期均顺延是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本施工计划按暖通图纸的要求进行施工,如图纸有变动,施工周期均顺延
问题补充:

  • 匿名
2013-05-23 12:21:38
The construction plans required by the HVAC drawings for construction, such as drawings change, the construction cycle are extended
  • 匿名
2013-05-23 12:23:18
This program of works by heating and drawing of the requirements for construction, such as drawings, and construction cycle changes are delayed
  • 匿名
2013-05-23 12:24:58
This construction plan according to passes the blueprint the request to carry on the construction warmly, if the blueprint has the change, the construction cycle postpones
  • 匿名
2013-05-23 12:26:38
The construction plan according to the drawings of HVAC requirements for construction, such as drawings and are subject to change, construction period is extended
  • 匿名
2013-05-23 12:28:18
② Steel bar processing and installment: The steel bar processing and the installment strictly carries on according to the design paper and the construction standard request.
 
 