当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:03年7月到05年2月在黄河发电场任助理工程师,负责污水控制是什么意思?

待解决 悬赏分:1 - 离问题结束还有
03年7月到05年2月在黄河发电场任助理工程师,负责污水控制
问题补充:

  • 匿名
2013-05-23 12:21:38
July 2003 to February 2005 as an assistant engineer in the Yellow River Farm, is responsible for water control
  • 匿名
2013-05-23 12:23:18
July 03 February 05 in the Yellow River power plant, an assistant engineer responsible for sewage control
  • 匿名
2013-05-23 12:24:58
03 year in July to 05 year in February sends the electric field in Yellow River to let assistant engineer, is responsible for the sewage control
  • 匿名
2013-05-23 12:26:38
From July 03 to February 05 in any of the Yellow River power plant engineer, responsible for sewage control
  • 匿名
2013-05-23 12:28:18
Took the post as the assistant engineer in field of power generating of the Yellow River from July of 03 to February of 2005, is responsible for the sewage to control
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭