|
关注:1
2013-05-23 12:21
求翻译:负荷预测是输变电项目可行性研究的基础,包括电量需求预测和电力需求预测两部分内容。是什么意思?![]() ![]() 负荷预测是输变电项目可行性研究的基础,包括电量需求预测和电力需求预测两部分内容。
问题补充: |
|
2013-05-23 12:21:38
Load forecasting is the basis for power transmission project feasibility study, including forecasts of electricity demand and electricity demand forecasting of two parts.
|
|
2013-05-23 12:23:18
load forecasting power transmission project feasibility study is the foundation, including electricity demand forecasts and projections of demand for electricity two parts.
|
|
2013-05-23 12:24:58
The load forecast is the power transformer project feasibility study foundation, including the electric quantity demand forecast and the electric power demand forecasts two parts of contents.
|
|
2013-05-23 12:26:38
Load forecasting is the basis for power transmission and transformation project feasibility studies, including forecasts of electricity demand and demand forecast of two parts.
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区