|
关注:1
2013-05-23 12:21
求翻译:在运行调度计划中,应控制B区的开机方式,优先安排增加C区的发电机有功出力,从而减小a1站送出端电磁环网的影响,提高全网的输送能力。是什么意思?![]() ![]() 在运行调度计划中,应控制B区的开机方式,优先安排增加C区的发电机有功出力,从而减小a1站送出端电磁环网的影响,提高全网的输送能力。
问题补充: |
|
2013-05-23 12:21:38
In the operation scheduling program, Area B, the boot should be controlled manner, giving priority to increase the active area C of the generator output, thereby reducing side a1 station sent the impact of electromagnetic ring to improve the transmission capacity of the whole network.
|
|
2013-05-23 12:23:18
When you run the Activation program, should control the machine way B district, prioritize increased C district of generators, thereby reducing a meritorious contribution to dispatch station 1 port electromagnetic ring network and increase the capacity of transportation throughout the network.
|
|
2013-05-23 12:24:58
In the traffic control plan, should control the B area the starting way, first arranges to increase the C area the generator to active the output, thus reduces a1 station to deliver the terminal electromagnetism ring net the influence, enhances the entire net delivery capacity.
|
|
2013-05-23 12:26:38
Operation planned, should control area b on, priority c district of generator power output increases, thereby reducing A1 points out side effects of electromagnetic loop network, improving overall network transmission capacity.
|
|
2013-05-23 12:28:18
In the operation scheduling program, Area B, the boot should be controlled manner, giving priority to increase the active area C of the generator output, thereby reducing side a1 station sent the impact of electromagnetic ring to improve the transmission capacity of the whole network.
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区