|
关注:1
2013-05-23 12:21
求翻译:断面1与断面2同时送电具有相关性,控制其中之一的输送功率提高10%后保持不变,考察另一个断面的可用输电能力。由于系统中送受电区均有较强的电源支撑能力,故采用送端增加发电、受端减少发电的功率增长模式。经过筛选并加入断面相关线路、设备故障后,故障集包括60个N-1热稳故障和50个暂稳故障。是什么意思?![]() ![]() 断面1与断面2同时送电具有相关性,控制其中之一的输送功率提高10%后保持不变,考察另一个断面的可用输电能力。由于系统中送受电区均有较强的电源支撑能力,故采用送端增加发电、受端减少发电的功率增长模式。经过筛选并加入断面相关线路、设备故障后,故障集包括60个N-1热稳故障和50个暂稳故障。
问题补充: |
|
2013-05-23 12:21:38
Section 1 and section 2 are associated with power transmission, control one of the transmission power by 10% in unchanged visit another section of the available transmission capacity. As the delivery system by the electric power area has a strong ability to support, it is sent to end the use of incr
|
|
2013-05-23 12:23:18
Sections 2 and 1 and sections are of relevance to send power to control one of the 10 per cent increase in power transmission would remain unchanged after inspection, another fracture of the available transmission capacity. Because of a system in which sent the district has been relatively strong po
|
|
2013-05-23 12:24:58
The cross section 1 has the relevance with the cross section 2 at the same time power transmission, after controls one of them the transportation power to enhance 10% to maintain invariably, inspects another cross section available transmitting capacity.Because in the system delivers electricity are
|
|
2013-05-23 12:26:38
Correlation between section 1 and section 2 at the same time the transmission, control after sending and power improving 10% one remains the same, visit another section of the available transfer capacities. Since sending in the system area shall have strong ability of power support, so sending-end i
|
|
2013-05-23 12:28:18
Section 1 and section 2 are associated with power transmission, control one of the transmission power by 10% in unchanged visit another section of the available transmission capacity. As the delivery system by the electric power area has a strong ability to support, it is sent to end the use of incr
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区