当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:首先在铜坑矿开展了泥量调查、泥浆采样点的布置设计与采样测定等工作是什么意思?

待解决 悬赏分:1 - 离问题结束还有
首先在铜坑矿开展了泥量调查、泥浆采样点的布置设计与采样测定等工作
问题补充:

  • 匿名
2013-05-23 12:21:38
First launched in the copper pit mine survey of mud, mud sampling design and layout of the sampling point determination, etc.
  • 匿名
2013-05-23 12:23:18
First of all in copper mine survey was carried out in mud, mud sampling points, such as the layout work and sampling measurement
  • 匿名
2013-05-23 12:24:58
First has carried out the putty quantity investigation, the mud sampling point arrangement design and the sampling in the copper pit ore measures the grade work
  • 匿名
2013-05-23 12:26:38
First mud in tongkeng mine survey, the determination of layout design of slurry sampling and sample work
  • 匿名
2013-05-23 12:28:18
First launched in the copper pit mine survey of mud, mud sampling design and layout of the sampling point determination, etc.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭