求翻译:1门窗应采用预留洞口方式。门窗框安装应安排在地面、墙面湿作业完成之后。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1门窗应采用预留洞口方式。门窗框安装应安排在地面、墙面湿作业完成之后。
问题补充:

  • 匿名
2013-05-23 12:21:38
1 doors and windows should be reserved for the hole way. Install door frames should be arranged in floors, walls, wet work is complete.
  • 匿名
2013-05-23 12:23:18
Doors and windows 1 hole reserved manner should be used. install door frames should be arranged in the ground and wall wet operation after completion.
  • 匿名
2013-05-23 12:24:58
1 windows and doors should use reserve the Dongkou way.The gate window frame installment should arrange after the ground, the wall surface wet work to complete.
  • 匿名
2013-05-23 12:26:38
1 reserve entrance doors and Windows should be used. Door window frames should be installed in the ground, walls wet after a job completes.
  • 匿名
2013-05-23 12:28:18
1 windows and doors should use reserve the Dongkou way.The gate window frame installment should arrange after the ground, the wall surface wet work to complete.
 
 