求翻译:16. 不详之处参见《35KV及以下电缆敷设》94D101-5、《线槽配线安装》96D301-1、《电缆桥架安装》04D701-3、《钢导管配线安装》03D301-3。是什么意思?![]() ![]() 16. 不详之处参见《35KV及以下电缆敷设》94D101-5、《线槽配线安装》96D301-1、《电缆桥架安装》04D701-3、《钢导管配线安装》03D301-3。
问题补充: |
|
2013-05-23 12:21:38
16 of unknown See "35kv and below cable laying 94d101-5, trunking wiring installed 96d301-1, cable tray installation 04d701-3" steel conduit wiring installation "03d301-3.
|
|
2013-05-23 12:23:18
One of the 16 unknown, see the 35 and the following cable laying KV > D 94 101 - 5, the online slot with 96 lines of D installed 301 - 1 , the cable bridge mounting D 04 of 701 - 3 , the steel conduit wiring installation of D 03 301 - 3.
|
|
2013-05-23 12:24:58
正在翻译,请等待...
|
|
2013-05-23 12:26:38
16. see the unknown 94D101-5 of the cable of 35KV and below, the line slot wiring 96D301-1 the installation, the cable bridge rack mounting 04D701-3, the steel conduit wiring installation 03D301-3.
|
|
2013-05-23 12:28:18
16. Is unclear the place to see also "35KV And Following Cable laying" 94D101-5, "Trunking Matches Line Installment" 96D301-1, "Electric cable Bridge Installment" 04D701-3, "Steel Drive pipe Matches Line Installment" 03D301-3.
|