当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:相关附属及路面施工的速度明显加快,也为年底象山港大桥通车奠定坚实基础。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
相关附属及路面施工的速度明显加快,也为年底象山港大桥通车奠定坚实基础。
问题补充:

  • 匿名
2013-05-23 12:21:38
Related subsidiaries and road construction significantly faster, and also to lay a solid foundation for the end of Xiangshan Port Bridge.
  • 匿名
2013-05-23 12:23:18
The road and the construction has significantly accelerated at the end, Xiangshan Port opening of the bridges provide a solid foundation.
  • 匿名
2013-05-23 12:24:58
The correlation attached and the road surface construction speed speeds up obviously, also is open to traffic for the year's end Xiangshan port bridge lays the solid foundation.
  • 匿名
2013-05-23 12:26:38
Relevant subsidiary and pavement construction significantly faster, as well as lay the solid foundation of Xiangshan port bridge open to traffic by the end.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭