|
关注:1
2013-05-23 12:21
求翻译:式(2)中洪水过程中的CBi根据基流24h污染过程按洪水发生时间差值得到。是什么意思?![]() ![]() 式(2)中洪水过程中的CBi根据基流24h污染过程按洪水发生时间差值得到。
问题补充: |
|
2013-05-23 12:21:38
(2) in the flood process the cbi according to 24h pollution process of the base flow by the time difference between the flood.
|
|
2013-05-23 12:23:18
(2) in the process of flood CBi 24 h under the base Stream pollution by floods is worth the time.
|
|
2013-05-23 12:24:58
Type in (2) flood process CBi has the time interpolation according to the base current 24h pollution process according to the flood to obtain.
|
|
2013-05-23 12:26:38
(2) in the CBi during flood time difference according to the base stream 24h pollution processes occur in the flood deserve to.
|
|
2013-05-23 12:28:18
, (2) in the floods in CBi process under base flow 24 H contamination by flood occurred during that time. ;
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区