求翻译:墩身施工时,内脚手架工作平台的组装、钢筋的绑扎、模板的翻升、混凝土的浇筑等工序是循环进行的,墩身的三节模板也是每次一节、由下往上循环翻升。整个施工过程是不间断、循环进行的,因此施工速度较快。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
墩身施工时,内脚手架工作平台的组装、钢筋的绑扎、模板的翻升、混凝土的浇筑等工序是循环进行的,墩身的三节模板也是每次一节、由下往上循环翻升。整个施工过程是不间断、循环进行的,因此施工速度较快。
问题补充:

  • 匿名
2013-05-23 12:21:38
Pier construction, the assembly within the scaffolding work platform, steel banding, turned up a template, such as concrete pouring cycle process is carried out, the three piers each time a template is, from bottom to top circulation turned up. Throughout the construction process is continuous, loop
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
When the pillar body constructs, in the scaffold working platform assembly, the steel bar bind, the template turn rise, concrete working procedures and so on construction are the circulation carry on, the pillar body three templates also are each time one, from bottom up circulate turn rise.The enti
  • 匿名
2013-05-23 12:26:38
Bridge pier construction, scaffolding work platform Assembly, reinforced binding, template, turn up, pouring of concrete process was carried out in cycles, Pier consists of templates is also a section at a time, circulation rose up from below. Throughout the construction process is continuous, circu
  • 匿名
2013-05-23 12:28:18
Pier construction, the assembly within the scaffolding work platform, steel banding, turned up a template, such as concrete pouring cycle process is carried out, the three piers each time a template is, from bottom to top circulation turned up. Throughout the construction process is continuous, loop
 
 