|
关注:1
2013-05-23 12:21
求翻译:②安装顺序,箱体、立柱、探臂、后拉杆、篮板、篮筐、上拉杆、下拉杆、加配重。是什么意思?![]() ![]() ②安装顺序,箱体、立柱、探臂、后拉杆、篮板、篮筐、上拉杆、下拉杆、加配重。
问题补充: |
|
2013-05-23 12:21:38
② installation sequence, box, column, the exploration arm, after the lever, rebound, basket, rod, under the rod to add weight.
|
|
2013-05-23 12:23:18
2 installation sequence, Case, standards, and a lever arm, back, rebounds, basket, the lever, the lever, and the ballast.
|
|
2013-05-23 12:24:58
②Installs the order, the box body, the column, searches the arm, the backstay, the backboard, the basket, the upper link, the lower connecting rod, dubs in heavily.
|
|
2013-05-23 12:26:38
② the order of installation, Cabinet, column, after exploration arm, tie rod, backboard, basket, upper levers, levers, and under weight.
|
|
2013-05-23 12:28:18
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区