求翻译:测量放样:每层填土上料前,均用全站仪准确放出中线、边线位置,确保填筑平面准确。是什么意思?![]() ![]() 测量放样:每层填土上料前,均用全站仪准确放出中线、边线位置,确保填筑平面准确。
问题补充: |
|
2013-05-23 12:21:38
Survey and setting out: on the material before each filling, were released with a total station and accurate centerline, edge position, filling planes to ensure accuracy.
|
|
2013-05-23 12:23:18
measurements: each floor filling, placed as personal data before they are used throughout the site detectors emit centerline, Moon graphic accurate location to ensure that reclamation.
|
|
2013-05-23 12:24:58
Survey lofting: In front of each earth fill high-quality goods, uses the entire station meter to emit the median line, the sideline position accurately, guarantees the reclamation plane to be accurate.
|
|
2013-05-23 12:26:38
Of survey: before each layer on the filling material, accurate release, edge locations in the middle line with total station, ensure accurate filling of plane.
|
|
2013-05-23 12:28:18
Survey and setting out: on the material before each filling, were released with a total station and accurate centerline, edge position, filling planes to ensure accuracy.
|