|
关注:1
2013-05-23 12:21
求翻译:Buyer shall provide the trainees cooporate with Seller engineer for pre-checking of the installation of the SUPPLIES during COMMISSIONING, the respective cleaning works and mechanical tests to prepare the PLANT ready to START-UP and demonstrating the Guarantee Test Runs for a duration as stipulated under ANNEX 3 Item 是什么意思?![]() ![]() Buyer shall provide the trainees cooporate with Seller engineer for pre-checking of the installation of the SUPPLIES during COMMISSIONING, the respective cleaning works and mechanical tests to prepare the PLANT ready to START-UP and demonstrating the Guarantee Test Runs for a duration as stipulated under ANNEX 3 Item
问题补充: |
|
2013-05-23 12:21:38
买受人应当提供的的学员cooporate与卖方耗材的安装调试过程中的预检查工程师,在各自的清洗工程和机械试验准备工期工厂准备启动和保证试验示范运行的规定下附件三项目3.0以上。
|
|
2013-05-23 12:23:18
买方与卖方提供的学员cooporate工程师进行预检查的安装调试过程中的耗材,各个清洁工程和机械测试的工厂已准备就绪,可以开始准备的,表现了保证测试运行的持续时间,根据附件3项目3.0以上。
|
|
2013-05-23 12:24:58
买家提供实习生与卖主工程师合作为预先校验供应的设施在委任,各自清洁工作和机械测试期间植物准备好对起动和展示保证测验运行为期间做准备如被规定在附录3项目3.0之下以上。
|
|
2013-05-23 12:26:38
买方须提供学员配合卖方工程师安装调试的各自的清洗工程和机械测试,以准备准备启动植物及演示根据附件 3 规定时间保证测试运行期间供应的报批项目 3.0 以上。
|
|
2013-05-23 12:28:18
买主为了在委托期间供应的安装的检查前以卖主工程师将向练习生提供 cooporate,各自清扫工作和准备植物的机械测试准备好启动和演示保证测试竞选 持续如在附件下规定 3 上面的第 3.0 项。
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区